Delray Beach |
Code of Ordinances |
Title 11. BUSINESS REGULATIONS |
Chapter 111. PROPERTY ASSESSED CLEAN ENERGY PROGRAM ("PACE") |
§ 111.09. REPORTING.
Each PACE program shall provide a report to the city on a quarterly calendar basis, which shall include, at a minimum, the following information:
(A)
Dates of reporting period;
(B)
List of PACE projects started during the reporting period, separated by building type (e.g., single family, multifamily, retail, office, industrial, etc.);
(C)
List of PACE projects completed during the reporting period, separated by building type (e.g., single family, multifamily, retail, office, industrial, etc.). For each completed project, specify: (1) the qualifying improvements made; (2) project start date and completion date; (3) the projected energy savings and/or amount of potential renewable energy to be generated (may be based on averages for type of improvement); (4) financial information such as cost per kWh saved/generated; (5) other resource savings if data is available; and (6) audits performed detailing the audit results, if applicable to the project.
(D)
Number of jobs created during the reporting period, including local versus non-local jobs and permanents versus temporary jobs;
(E)
Number of applications declined during the reporting period;
(F)
Unresolved complaints or contractor issues and status;
(G)
Description of the standardized third-party methodologies and supporting assumptions used to verify data, and any changes in the methodologies and assumptions from the previous reporting period.
(Ord. No. 13-17 , § 2(Exh. A), passed 5/2/17)